Oto Modul Air Installation, Grassington, North Yorkshire
Successful curved installation completed by our installation team recently.
The installation was carried out in Grassington, North Yorkshire in the lovely Yorkshire Dales. The stairlift installed was a brand new Oto Modul Air Curved stairlift.
Installation of the track was on the right hand internal side. The track required 180° wrap at the bottom so that it would park neatly away and leave sufficient space to pass when not in use. The track then continued up the straight section of steps followed by 180° turn, another straight section with a run-on at landing level for parking at the top.
Installation took around 4 hours with minimum disruption in the home.
Here are some pictures of the completed work....
To see more of our work, click here: Stairlift Installation Examples
